ECG prepares its system operators and controllers ahead of December polls

-

The Electricity Company of Ghana (ECG) has commenced the preparation of its control engineers and system  operators to be fully equipped to handle all emergencies during and after the December polls.

Organized by the Ashanti Sub-Transmission Region of ECG at the Boadi Regional Office in Kumasi, the 3-day in-house capacity-building program

Aimed at instilling confidence in participants to perform their duties professionally while being crisis-ready.

ECG staffwww.adommonline.com
ECG staff at the training program

It saw participants, mostly controllers and system operators being divided into batches in that intensive training program.

“With this training and preparations underway, ECG assures the general public that, as a stakeholder in the socioeconomic development of Ghana, it is committed to providing quality, safe, and reliable electricity. It stands ready to ensure supply reliability to meet all energy needs,” the Facilitator, Ing Peter Fletcher said.

ECG staf fwww.adomonline.com
The rigorous training sessions were to position staff during the elections

Facilitators for the training program included, General Manager for the region, Ing Kurt Festus Plange, Control Engineer, Accra Sub-T; and Ing Christopher Anafo , Manager for Protection and Control of Ashanti Sub- T, assisted with facilitation of the program.